• Home
  • About
    • Company Overview
    • Awards
  • Services
    • Transportation
    • Planning & Traffic Engineering
    • Civil
    • Water Resources/Environmental
    • Structural
    • Construction Inspection
  • CAREERS
  • Contact Us
    • Locations

Hatton Highway Bridge Replacement Over Pahokee Water Control District’s Canal No. 2

Client: Palm Beach County Highway Division | Palm Beach County

The bridge design was based on providing a similar three-span arrangement over the canal and a 60' clearance. The bridge cross section included two 12-foot lanes with 8-foot shoulders, concrete barriers, and no provisions for sidewalks. Wing walls and slope protection were designed to accommodate the new bridge highway alignment and typical section. The bridge design elements were developed in accordance with the County’s thoroughfare road and bridge design procedures. R.J. Behar was responsible for all permit coordination on the project. Successful completion of the plans and specifications was achieved with a final score of 97 out of 100.
Address:6861 SW 196 Avenue Suite 302Pembroke Pines, FL 33332
Phone: (954) 680-7771Email: rjbehar@rjbehar.com Service Area: South Florida
Copyright © 2025 R.J. Behar & Company, Inc. All rights reserved. Website by web.com

We use cookies to enable essential functionality on our website and analyze website traffic. For more information, read our Cookies and Privacy Policy.

Your Cookie Settings

We use cookies to enable essential functionality on our website and analyze website traffic. For more information, read our Cookies and Privacy Policy below..

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites.

Analytics

These cookies collect information that is used in aggregate and in an anonymized form to help us understand how our website is being used and how effectively our site is performing.